Time Management: Updates

Today we are going to continue with our editing. We are currently editing the final half of the film.

Wednesday, 19 January 2011

Production: Editing

Our group are now in the process of editing. After the clips have been uploaded and cut down we are experimenting with different speeds on different shots. Seeing whether this makes a positive effect on the clip an example of where this has been used is the writing of actors name etc...
'Power-points' are being created for the introductory shots such as this one:





For the meantime filming is going really well, as extra shots where taken on each day of filming we have the chance to try out different shot types and see which fits best. A slight problem arose with some cuts as they looked like they are jumping from place to place, however we overcome this problem as we cut to the shots where we name the actors and the production team.


Some of the shot times have been cut down because not a lot actually happened in the introduction.

Other than that, editing has worked out better than we had presumed it would

Production: Editing

Last Friday we uploaded all of the clips onto premier. Premier is the programme where the editing will take place. As we have a basic idea of how the introduction will look together we are putting all the initial clips together seeing how it looks and what it needs. We will do a more detailed edit once all clips are uploaded and once the best clips of each shot have been selected, at the moment we are focusing on it flowing and being continuous.
Here our some screen shots of our process so far:


Time Management: Updates

Over the past few lessons we have been editing the film taken and trying to turn it into an effective film opening

Wednesday, 12 January 2011

Time Management: Updates

Today we are going to be filming the 'production company' shoot and the 'actors names' shoot with the locker.

Monday, 10 January 2011

Audience Research: Updates.

Over the weekend another research meeting took place. From this
 we where looking to get the groups feeling on our animatic. All 
facebook feedback was positive, however after private emails where
 sent out there where a few minor things that where suggested to
 be changed if we want to achieve perfection.

Time Management: Updates

In today's lesson we couldn't film as we didn't have the camera. However we have now booked one out and filled a risk assessment out we are all set to film later in the day.

Planning: Filming - Risk Assessment

Potential Danger
Potential outcomes
Actions to avoid potential outcomes
Further comments
Tripping over the tripod. 
Serious injuries such as breakages and fractures of bones.
Place the tripod away from anyone, and warn people of the danger.
Whoever is filming is responsible for telling people of the hazard. 
slipping over on the wet floor due to rain.
Serious injuries such as breakages and fractures of bones.
Tell actors of the potential risk before filming starts.
All of us need to make sure we are communicating and warning the actors.
Being ran over when filming in the car park.
Serious injuries such as breakages and fractures of bones.
Make sure filming takes place away from the main flow of traffic.
All of us need to make a concious decision of where is safest to film.
Tripping over lighting kit & power cables.
Serious injury, electrocution.
If Cables are used they are to be 'gaffer taped to the floor for the duration of the shot.
Sam will be in charge of taping cables to the floor.

Wednesday, 5 January 2011

Time Management: Updates

Today we have tested out the camera, bought in by Jess. As it worked fine it means we have a better opportunity of filming more regularly, when we want as we don't need to worry about booking camera's out. Hopefully because of this filming will run more smoothly.

Organisation: Casting

Due to a complication mentioned in a earlier blog the cast list was delayed,
 but thankfully we managed to overcome this problem as somebody has now
 stepped in to fill the role of 'Austin' at the last minute as the previous actor 
has fallen ill. 

Here's the most up to date completed Casting table.

Photos of the potential cast:
William Chambers (playing the part of Austin), Luke Whitfield and Owain 
Thomas (playing Austin's friends)

Owain Thomas
Luke Whitfield
William Chambers

Tuesday, 4 January 2011

Time Management: Updates

A problem has occurred during the Christmas Holidays, after being set to film the first day back after the christmas holidays, although the person who we had set up to play the character of the Popular Guy 'Austin', will now be absent during the filming period. We are trying to find a new person willing to play the character, but because of this, filming will be delayed.